We are grateful to Douglas McNaught, former Naval architect at Campbeltown Shipyard, for sharing some of his archive with us. This archive entry is a document with the specification for a 33.5 metre well boat which was built as the Solea (Yard No. 85), for Golden Produce of Connel, Argyll…
Documents and Correspondence
We are grateful to Douglas McNaught, former Naval architect at Campbeltown Shipyard, for sharing some of his archive with us. This archive entry includes correspondence between Heimdal Propulsion A-S, Norway and the Yard in Campbeltown and also performance diagrams for the PD-1850mm 19a (Ka-3-65 series) nozzle propeller. 3rd September, 1987….
We are grateful to Douglas McNaught, former Naval architect at Campbeltown Shipyard, for sharing some of his archive with us. This archive entry is a letter from W. C. Keith, the managing director of Dauntless Marine Engineering and Supply Company Ltd, Banff, who was writing in response to an enquiry…
We are grateful to Douglas McNaught, former naval architect at Campbeltown Shipyard, for sharing this “New Construction Agreement”, standard contract. It’s an interesting legal pro-forma that shows the terms on which the boats were built and paid for. New Construction Agreement, Campbeltown Shipyard. [Page 1]. Courtesy of Douglas McNaught. New…